SR Power Supplies Rack Detailed Design for ALS-U
- Deadline
- Closed (was October 2, 2026)
- Jurisdiction
- California
What the buyer wants
LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information. Attendance is optional and will not be evaluated negatively against any submitted proposal. The conference is intended to be recorded and publicized after it concludes. Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0Zn
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.