Cable Fiber Install ATC Tower Dobbins ARB
- Deadline
- September 18, 2026
- Jurisdiction
- Federal
- Sectors
- ev-charging
What the buyer wants
PERFORMANCE WORK STATEMENT (PWS) Project Title: 12-Strand, 150-Foot Single Mode (SM) Fiber Optic Cable Installation and Upgrades for NINJA System Location: Air Traffic Control (ATC) Tower, Dobbins Air Reserve Base (ARB) 1.0 General Scope The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform t
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.