Federal RFPs

Federal solicitation

EUR/Athens - Maintenance of Building Automation System

Deadline
Closed (was August 24, 2026)
Jurisdiction
Federal
Sectors
ev-charging

What the buyer wants

SYSTEM POINT LIST SYSTEM POINT DESCRIPTION NOTES AIR HANDLERS VAV AIR HANDLERS X Diagramatic system graphic (each) FAN START/STOP X FAN STATUS X X X FAN VFD SPEED X FAN VFD SPEED FEEDBACK X FAN VFD FAIL X X HIGH STATIC PRESSURE FAN CUTOUT X Hard wired to fan starter CHW VALVE X OA / RETURN AIR DAMPER X DISCHARGE TEMPERATURE X DISCHARGE HUMIDITY X DUCT STATIC PRESSURE X OUTSIDE AIR FLOW MONITOR X M

Read the full solicitation at the source ↗

Can you even bid on this?

Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.

Try it on a real RFP · 30 seconds, no signup

Summary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.