What the buyer wants
Questions and Answers - Fiber Optic 1. Installation Method and Burial Depth SOW §4 requires a 2-inch HDPE conduit with tracer wire, a second 2-inch HDPE conduit for future expansion in the same trench, and a trench depth of 18 to 24 inches. Q&A 5.1 states the fiber will be placed in conduit. At the site visit, Government representatives indicated a preference for direct-buried fiber at approximate