Fiber Optic Network Rebuild

Deadline
Closed (was September 28, 2026)
Jurisdiction
Federal
Sectors
ev-charging

What the buyer wants

Questions and Answers - Fiber Optic 1. Installation Method and Burial Depth SOW §4 requires a 2-inch HDPE conduit with tracer wire, a second 2-inch HDPE conduit for future expansion in the same trench, and a trench depth of 18 to 24 inches. Q&A 5.1 states the fiber will be placed in conduit. At the site visit, Government representatives indicated a preference for direct-buried fiber at approximate