ISBEE/IEE Uninterruptible Power Supply (UPS) Replacement
- Deadline
- Closed (was August 19, 2026)
- Jurisdiction
- Federal
- Sectors
- ev-charging
What the buyer wants
Statement of Work (SOW) 1. PROJECT TITLE: Billings Area Office UPS Replacement 2. BACKGROUND/PURPOSE: This Statement of Work outlines the scope, deliverables, responsibilities, and terms for the procurement, delivery, installation, startup, removal of existing UPS equipment and batteries, and support of an uninterruptible power supply (UPS) system for the Billings Area IHS. 3. SCOPE: The Contracto
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.