← Federal RFPs

Federal solicitation

Preventative Maintenance Gas Detection System (Re-Bid)

Deadline
Closed (was October 20, 2026)
Jurisdiction
Federal

What the buyer wants

Clarification: The gas sensors are a part of the gas detection system. The system consists of 2 main components, the Draeger Quadgard controller, and the remote gas sensors. Amendment 0001 is being issued 10/7/26 Note: HF Gas Sendor Replacment shall be included in the Annual Fee. This is a combined synopsis/solicitation for commercial items prepared In Accordance With (IAW) FAR Overhaul Subpart 12

Read the full solicitation at the source ↗

Can you even bid on this?

Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.

Try it on a real RFP · 30 seconds, no signup

Summary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.