Federal RFPs

Federal solicitation

Replace greenhouse lighting

Deadline
Not stated
Jurisdiction
Federal
Sectors
ev-charging

What the buyer wants

Large Greenhouse Railings will be around 10.4 feet above ground, LED natural daylight lighting needed above each table / zone. Manual Pulleys for raising each light, not motor driven H H Heater overlaps table slightly – we need light fixtures over pink zones. 46” 46” 14”14”14” 18”18”18” 7 7 90” 66” 108” 66” 108” 108” 120” 20” 20” 12”12” 120” 1 2 3 4 22” 40” 1 2 3 This heater does overlap table

Read the full solicitation at the source ↗

Can you even bid on this?

Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.

Try it on a real RFP · 30 seconds, no signup

Summary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.