REPLACEMENT OF INDUCTION HEATING SYSTEM INVERTER POWER MODULES
- Deadline
- Closed (was September 3, 2026)
- Jurisdiction
- Federal
- Sectors
- ev-charging
What the buyer wants
STATEMENT OF WORK Contract Type: Firm-Fixed-Price (FFP) Supply Order Requiring Office: NASA Marshall Space Flight Center (MSFC), ER64 1.0 INTRODUCTION AND PURPOSE This Statement of Work (“SOW”) defines the procurement and delivery requirements for upgraded replacement high-frequency power modules. The current VIF Type modules in an existing Inductoheat type V8M4S inductive heating system operated
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.