Structural Engineering services to prepare ASCE Tier 2 Seismec Evaluation and retrofit design
- Deadline
- Closed (was August 13, 2026)
- Jurisdiction
- Federal
- Sectors
- ev-charging, charge-management-software
What the buyer wants
STATEMENT OF WORK 1. Objective/Requirements Tier 2 seismic engineering analysis, per ASCE 41, to confirm whether the potential deficiencies identified in ASCE Tier 1 study (already completed) are, in fact, actual deficiencies. In this analysis, Tier 1 areas of concern are shown to either (a) be a deficiency that warrants retrofit, or (b) not to be a deficiency where no retrofit is warranted or nee
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.