Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades
- Deadline
- Closed (was September 1, 2026)
- Jurisdiction
- Federal
- Sectors
- ev-charging
What the buyer wants
RFI # Question/Comment Response 1 What is the thickness of the existing concrete transformer pads that are to be removed? Any existing conditions not specified in the design documents are required to be field verifiedby the contractor. 2 Are any of the existing transformer pads located on top of existing vaults? Any existing conditions not specified in the design documents are required to be field