Federal RFPs

Federal solicitation

Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II Solicitation

Deadline
September 10, 2026
Jurisdiction
Federal
Sectors
construction

What the buyer wants

Controls Clarification The intention is to have DDC for all loads. The Pneumatic controls and system once in place are beyond economical use, therefore there shall be no pneumatic devices called for. See scanned new work plan drawing set highlighting loads and guidance to assist with cost estimation. The controls intention for each room or area is labeled as OEC (occupied end-user controls), OP -

Read the full solicitation at the source ↗

Can you even bid on this?

Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.

Try it on a real RFP · 30 seconds, no signup

Summary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.