Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II Solicitation
- Deadline
- September 10, 2026
- Jurisdiction
- Federal
- Sectors
- construction
What the buyer wants
Controls Clarification The intention is to have DDC for all loads. The Pneumatic controls and system once in place are beyond economical use, therefore there shall be no pneumatic devices called for. See scanned new work plan drawing set highlighting loads and guidance to assist with cost estimation. The controls intention for each room or area is labeled as OEC (occupied end-user controls), OP -
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.