LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
- Deadline
- Not stated
- Jurisdiction
- Missouri
What the buyer wants
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter ga
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.