TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Wick and Fill Platform
- Deadline
- December 3, 2026
- Jurisdiction
- New Mexico
- Sectors
- software
What the buyer wants
This technology platform from Los Alamos National Laboratory enables more reliable high-temperature heat pipe reactors by improving the way critical wick structures are manufactured and how heat pipe arrays are filled, sealed, and checked for quality. A stronger wick gives the system the capillary action needed to move liquid metal through the pipe under demanding thermal conditions, while the fil
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.