New Manufactured Material, NSN: 2915-01-463-7933 PR (3D)
- Deadline
- December 2, 2026
- Jurisdiction
- Oklahoma
What the buyer wants
SYNOPSIS – F110 FUEL CONTROL,AFTERB Estimated solicitation issue date 2 Nov 26 and estimated closing/response date 2 Dec 26. RFP #: SPRTA1-27-R-0006 PR#: FD2030-27-00135 Nomenclature/Noun: FUEL CONTROL,AFTERB NSN: 2915014637933PR PN: 7113M19G06 Application (Engine): F110 AMC: 3D History: GE Aviation Description: Dimensions: Length 12.0 in, Width 12.0 in, Height 7.6 in, Weight 32lbs. Function: The
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.