OR FS FREWN602 28(1), Road 28 Reconstruction
- Deadline
- January 31, 2027
- Jurisdiction
- Oregon
What the buyer wants
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes
Read the full solicitation at the source ↗
Can you even bid on this?
Nimra reads the whole document and returns the requirements checklist, starting with the items that disqualify bidders before anyone reads their price.
Try it on a real RFP · 30 seconds, no signupSummary written by Nimra from the public posting; the solicitation itself stays with the issuing agency. Requirements and deadlines change — confirm at the source before you bid.